NYC sign permit checklist

A printable, step-by-step pre-installation checklist for New York City sign permits. Tick every box before fabrication so nothing delays your sign-off — from zoning survey to final DOB approval.

1. Site & zoning

  • Measure the facade: width, height, and available mounting area
  • Confirm the zoning district (commercial, manufacturing, residential)
  • Check special district rules (MiD, SoHo NoLIta, waterfront, etc.)
  • Look up landmark or historic district status on the LPC map
  • Review the lease for landlord sign criteria and COI requirements
  • Photograph the install location from multiple angles

2. Design & drawings

  • Finalize sign dimensions, materials, and finishes
  • Specify illumination type (LED, halo-lit, non-illuminated)
  • Detail the mounting method and structural attachments
  • Include electrical and wiring details for illuminated signs
  • Have drawings signed and sealed by a registered design professional
  • Confirm the sign area and projection meet zoning limits

3. Landmark review (LPC)

  • Confirm the property is in a landmark district or is a landmark
  • Submit design to LPC for a certificate of no effect or appropriateness
  • Receive LPC approval before filing with DOB
  • Keep the LPC approval letter with your permit records

4. DOB filing

  • Create a DOB NOW: Build sign work permit application
  • Upload signed and sealed drawings and supporting documents
  • Pay the required DOB filing fees
  • Track application status and respond to plan examiner comments
  • Receive the approved sign permit before any fabrication

5. Fabrication & installation

  • Fabricate the sign to match the approved drawings exactly
  • Schedule a licensed, insured installation crew
  • Arrange lift equipment, scaffolding, or swing-stage as needed
  • Coordinate building access and any sidewalk permit (DOT)
  • Install the sign per the approved mounting method

6. Inspections & sign-off

  • Schedule any required electrical or structural inspections
  • Confirm the installed sign matches the approved plans
  • Request and receive the final DOB sign-off
  • Keep the permit and sign-off paperwork on file
  • Photograph the completed installation for records

Want KBC Signs to run this checklist for you?

We handle the survey, drawings, LPC and DOB filing, fabrication, and licensed installation — so every box on this list is checked by one team.

Request a Quote

Cite this checklist

KBC Signs maintains this NYC sign permit checklist as a free reference for businesses, architects, and property managers. You are welcome to link to it: NYC Sign Permit Checklist. A branded PDF version is free to download and share with your team, clients, or tenants: NYC Sign Permit Checklist (PDF).